Purchases
The following tables represent ARRA funds programmed for:
Funds for Vehicles
These tables display the amount of ARRA funds programmed for vehicle expenses and the number of vehicles funded.
ARRA Bus Vehicle Purchases
| Vehicle (BUS) | Quantity | % of Total | Amount |
|---|---|---|---|
| Bus STD 40 FT | 2077 | 17.97% | $755,103,008 |
| Bus STD 35 FT | 892 | 7.72% | $309,336,649 |
| Bus 30 ft | 678 | 5.87% | $184,280,988 |
| Bus < 30 ft | 3670 | 31.76% | $291,388,266 |
| Bus Articulated | 227 | 1.96% | $173,897,589 |
| Bus Commuter / Suburban | 60 | 0.52% | $30,813,295 |
| Bus Double Deck | 12 | 0.10% | $10,839,567 |
| Bus Dual Mode | 150 | 1.30% | $63,826,865 |
| Bus Intercity | 180 | 1.56% | $43,958,966 |
| Bus Trolley Artic. | 5 | 0.04% | $576,284 |
| Bus Trolley Std. | 122 | 1.06% | $23,068,592 |
| Sedan / Station Wagon | 187 | 1.62% | $5,448,324 |
| Transferred Vehicles | 40 | 0.35% | $192,000 |
| Vans | 3255 | 28.17% | $146,792,385 |
| Grand Total | 11555 | 100% | $2,039,522,778 |
ARRA Rail Vehicle Purchases
| Rail | Quantity | % of Total | Amount |
|---|---|---|---|
| Commuter Locomotive Diesel | 47 | 7.07% | $94,474,443 |
| Commuter Locomotive Used | 1 | 0.15% | $1,025,000 |
| Commuter Rail Car Trailer | 71 | 10.68% | $600,000 |
| Commuter Rail Self Propelled - Elec | 4 | 0.60% | $7,574,000 |
| Heavy Rail Cars | 234 | 35.19% | $56,400,000 |
| Light Rail Cars | 308 | 46.32% | $162,411,621 |
| Grand Total | 665 | 100% | $322,485,064 |
Preventive Maintenance Programmed to Bus and Rail
This chart breaks out the total amount obligated for preventive maintenance into expenses for bus and rail.
Preventive Maintenance by Project Type
| Project Type | Bus PM | Rail PM | Total |
|---|---|---|---|
| Preventive Maintenance | $520,946,340 | $244,150,403 | $765,096,743 |
Funds for Transit Infrastructure
These tables display the amount of ARRA funds programmed to specific infrastructure expenses and, where applicable, the number of units funded.
| Transit Infrastructure Purchases By Purpose | Total |
|---|---|
| Electrictrification Power Dist. | $241,874,822 |
| Signal & Communication | $299,809,091 |
| Station Stops Terminals | $1,666,577,187 |
| Support F&E | $1,192,503,648 |
| Transit Enhancements | $133,465,654 |
| Transit-way Lines | $944,360,931 |
| Grand Total | $4,478,591,333 |
| Transit Infrastructure Purchases by Project Type | Total |
|---|---|
| Acquisition | $696,283,517 |
| Construction | $1,790,444,884 |
| Engineering & Design | $78,966,436 |
| Rehab / Renovation | $1,912,896,496 |
| Grand Total | $4,478,591,333 |
Major "Construction and Rehab / Renovation" Purchases
| Projects | Qty | Total |
|---|---|---|
| Admin / Maintenance Facility | 192 | $378,130,141 |
| Bridges | 2 | $105,893,535 |
| Bus / Passenger Shelters | 4330 | $109,325,757 |
| Bus Terminal | 25 | $67,885,071 |
| Busway | 2 | $85,154,199 |
| Communications System | 1047 | $74,432,100 |
| Ferry Terminal | 3 | $9,955,049 |
| Line Equipment / Struc Misc | 12 | $496,392,131 |
| Maintenance Facility | 66 | $246,552,440 |
| Park and Ride Lot | 43 | $111,162,479 |
| Ped. Access / Walkways | 164 | $24,487,837 |
| Power Distribution Substation | 22 | $147,605,937 |
| Signage | 3813 | $20,335,117 |
| Station | 677 | $650,989,470 |
| Storage Facility | 23 | $45,211,652 |
| Terminal, Intermodal (Transit) | 17 | $483,101,391 |
| Train Control / Signal System | 50 | $162,451,568 |
| Yards and Shops | 37 | $128,786,193 |
| Total | 10525 | $3,347,852,066 |