Purchases
The following tables represent ARRA funds programmed for:
Funds for Vehicles
These tables display the amount of ARRA funds programmed for vehicle expenses and the number of vehicles funded.
ARRA Bus Vehicle Purchases
Vehicle (BUS) | Quantity | % of Total | Amount |
---|---|---|---|
Bus STD 40 FT | 2077 | 17.97% | $755,103,008 |
Bus STD 35 FT | 892 | 7.72% | $309,336,649 |
Bus 30 ft | 678 | 5.87% | $184,280,988 |
Bus < 30 ft | 3670 | 31.76% | $291,388,266 |
Bus Articulated | 227 | 1.96% | $173,897,589 |
Bus Commuter / Suburban | 60 | 0.52% | $30,813,295 |
Bus Double Deck | 12 | 0.10% | $10,839,567 |
Bus Dual Mode | 150 | 1.30% | $63,826,865 |
Bus Intercity | 180 | 1.56% | $43,958,966 |
Bus Trolley Artic. | 5 | 0.04% | $576,284 |
Bus Trolley Std. | 122 | 1.06% | $23,068,592 |
Sedan / Station Wagon | 187 | 1.62% | $5,448,324 |
Transferred Vehicles | 40 | 0.35% | $192,000 |
Vans | 3255 | 28.17% | $146,792,385 |
Grand Total | 11555 | 100% | $2,039,522,778 |
ARRA Rail Vehicle Purchases
Rail | Quantity | % of Total | Amount |
---|---|---|---|
Commuter Locomotive Diesel | 47 | 7.07% | $94,474,443 |
Commuter Locomotive Used | 1 | 0.15% | $1,025,000 |
Commuter Rail Car Trailer | 71 | 10.68% | $600,000 |
Commuter Rail Self Propelled - Elec | 4 | 0.60% | $7,574,000 |
Heavy Rail Cars | 234 | 35.19% | $56,400,000 |
Light Rail Cars | 308 | 46.32% | $162,411,621 |
Grand Total | 665 | 100% | $322,485,064 |
Preventive Maintenance Programmed to Bus and Rail
This chart breaks out the total amount obligated for preventive maintenance into expenses for bus and rail.
Preventive Maintenance by Project Type
Project Type | Bus PM | Rail PM | Total |
---|---|---|---|
Preventive Maintenance | $520,946,340 | $244,150,403 | $765,096,743 |
Funds for Transit Infrastructure
These tables display the amount of ARRA funds programmed to specific infrastructure expenses and, where applicable, the number of units funded.
Transit Infrastructure Purchases By Purpose | Total |
---|---|
Electrictrification Power Dist. | $241,874,822 |
Signal & Communication | $299,809,091 |
Station Stops Terminals | $1,666,577,187 |
Support F&E | $1,192,503,648 |
Transit Enhancements | $133,465,654 |
Transit-way Lines | $944,360,931 |
Grand Total | $4,478,591,333 |
Transit Infrastructure Purchases by Project Type | Total |
---|---|
Acquisition | $696,283,517 |
Construction | $1,790,444,884 |
Engineering & Design | $78,966,436 |
Rehab / Renovation | $1,912,896,496 |
Grand Total | $4,478,591,333 |
Major "Construction and Rehab / Renovation" Purchases
Projects | Qty | Total |
---|---|---|
Admin / Maintenance Facility | 192 | $378,130,141 |
Bridges | 2 | $105,893,535 |
Bus / Passenger Shelters | 4330 | $109,325,757 |
Bus Terminal | 25 | $67,885,071 |
Busway | 2 | $85,154,199 |
Communications System | 1047 | $74,432,100 |
Ferry Terminal | 3 | $9,955,049 |
Line Equipment / Struc Misc | 12 | $496,392,131 |
Maintenance Facility | 66 | $246,552,440 |
Park and Ride Lot | 43 | $111,162,479 |
Ped. Access / Walkways | 164 | $24,487,837 |
Power Distribution Substation | 22 | $147,605,937 |
Signage | 3813 | $20,335,117 |
Station | 677 | $650,989,470 |
Storage Facility | 23 | $45,211,652 |
Terminal, Intermodal (Transit) | 17 | $483,101,391 |
Train Control / Signal System | 50 | $162,451,568 |
Yards and Shops | 37 | $128,786,193 |
Total | 10525 | $3,347,852,066 |