Enhanced Mobility of Seniors and Individuals with Disabilities Program Guidance
Enhanced Mobility of Seniors and Individuals with Disabilities Program Guidance and Application Instructions
Enhanced Mobility of Seniors and Individuals with Disabilities Program Guidance and Application Instructions
C 7050.108-25-14
PurposeThis circular is new guidance on the use of FTA funds or FTA-funded real property for joint development, and consolidates all FTA guidance on joint development. This circular incorporates provisions of the Moving Ahead for Progress in the 21st Century Act (MAP-21),...
C 9040.1H (Applicable on or after 11-01-2024) 09-27-2024
FTA has finalized an updated circular to assist recipients in their implementation of the Rural Areas Formula Program and the rural component of the Grants for Buses and Bus Facilities Program. The update and consolidation...
Number 2010-1003-03-15
The Office of Operations and Program Management for the Region 10 Office in Seattle, Washington has an opening for a permanent full-time General Engineer GS-0801-13.
This position serves as a Regional Engineer and directly manages the regional Project...
Title: Waterproofing and Its Effect on Operation and Maintenance of Underground Facilities
Phase(s): Preliminary Engineering
Category: Scope
Date: March 2, 1998
1. BackgroundRecent changes in the method of controlling ground water both during and after...
Title: R&D Projects – Computer Based Systems Warranties
Phase(s): Start-Up
Category: Scope
Date: August 2000
1. BackgroundThe Muni Automatic Train Control System (ATCS) contract started in 1992. The specification required an "In-Service-Proven"...
Title: Quality Assurance and Quality Control on a Design/Build Transit Project
Phase(s): Preliminary Engineering
Category: Scope
Date: September 8, 1997
1. BackgroundThe Mass Transit Administration (MTA) of the Maryland Department of Transportation is...
Title: Modular Station Design
Phase(s): Pre-Preliminary Engineering, Preliminary Engineering and Final Design
Category: Scope
Date: N/A
1. BackgroundThe Los Angeles Metro Rail Red Line is an 18.0 mile underground heavy rail program which began in 1986...