USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation

Regulations and Programs

756

Solicitations and Bid Options

Title: Benefits of Structuring Bid Documents with Options

Phase(s): Final Design, Construction

Category: Management

Date: April 21, 2009

1. Background

During multiple risk assessments and throughout the ensuing project implementation phases, numerous...

Early Risk Management Planning

Title: Risk Assessment for Transit ProjectsPhase(s): Final DesignCategory: ManagementDate: April 22, 2009

1. Background

The Regional Transportation District’s (RTD) West Corridor (WC) Project (WCP) is a 12.1 mile light rail transit (LRT) system that runs from the...

Value Engineering (VE) on Transit Projects

Title: Value Engineering on Transit Projects

Phase(s): Preliminary Engineering

Category: Management

Date: January 5, 1996

1. Background

The RAILTRAN Commuter Rail Project extends between Fort Worth and Dallas along an existing 34-mile corridor which was...

Using a Consultant as Both Designer and Construction Manager

Title: Using a Consultant as Both Designer and Construction Manager

Phase(s): Construction

Category: Management

Date: May 12, 1997

1. Background

The San Francisco Municipal Railway (Muni) engaged Bechtel Civil Corporation to design the Muni Metro...

Tri-Met's Construction Manager/General Contractor Approach

Title: Tri-Met's Construction Manager/General Contractor Approach

Phase(s): Final Design

Category: Management

Date: N/A

1. Background

Alternatives to traditional low bid procurement are increasingly being pursued by public agencies that want to ensure...

Transit Oriented Joint Development Opportunities

Title: Transit Oriented Joint Development Opportunities

Phase(s): Preliminary Engineering

Category: Management

Date: April 4, 1997

1. Background

The 7.5 mile Tasman West Light Rail Project in San Jose, California, has strong local support. The light...

Timely Preparation of Quality Assurance Program

Title: Timely Preparation of Quality Assurance Program

Phase(s): Pre-Preliminary Engineering and Preliminary Engineering

Category: Management

Date: April 4, 1997

1. Background

The "Lessons Learned" statement presented is derived from PMOC experience...

The Capabilities and Value of Electronic Communications

Title: The Capabilities and Value of Electronic Communications Phase(s): Pre-Preliminary Engineering, Preliminary Engineering, Final Design, Construction and Startup Category: Management September 8, 1997 1. Background During design and construction of Phase One of the St. Louis Light Rail...

Team Approach to Quality Assurance Audits

Title: Team Approach to Quality Assurance Audits

Phase(s): Final Design

Category: Management

Date: April 4, 1997

1. Background

The 7.5 Tasman West light Rail Project in San Jose, California has strong local support. The light rail system extension...