FTA Funding Allocations for Hurricane Sandy Recovery and Resiliency
Hurricane Sandy Recovery Projects
FTA Funding Allocations for Hurricane Sandy Recovery
(As of November, 2023)
Name of Recipient |
Project Name |
Total FTA Funds Allocated |
FTA Obligated Allocation Amount |
Remaining Allocation |
Notes and Comments |
---|---|---|---|---|---|
Connecticut Department of Transportation | Connecticut Department of Transportation | $55,622 | $53,073 | $2,549 | Total FTA Funds Allocated reflects amount allocated in Federal Register. |
Greater Bridgeport Transit District | Greater Bridgeport Transit District | $21,783 | $21,738 | $45 | |
Milford Transit District | Milford TD - Sandy Relief | $5,352 | $5,352 | $0 | |
Subtotal (Multiple Transit Projects - CONNECTICUT) | $82,757 | $80,163 | $2,594 | ||
Massachusetts Bay Transportation Authority | Massachusetts Bay Transportation Authority | $344,311 | $344,311 | $0 | |
Subtotal (Multiple Transit Projects - MASSACHUSETTS) | $344,311 | $344,311 | $0 | ||
New Jersey Transit Corporation | NJ Transit - Sandy Relief | $144,416,559 | $144,416,559 | $0 | |
New Jersey Transit Corporation | NJ Transit - Round 2 Recovery | $110,799,640 | $110,799,640 | $0 | |
New Jersey Transit Corporation | New Jersey Transit Corporation | $86,774,558 | $86,774,558 | $0 | |
New Jersey Transit Corporation | New Jersey Transit - Hurricane Sandy Recovery #4 | $102,831,982 | $102,831,982 | $0 | |
Port Authority of New York and New Jersey | PATH Trans Hudson Corp- Sandy Relief | $159,720,171 | $95,785,019 | $63,935,152 | Total FTA Allocated Funds are to support activities of the Port Authority of New York and New Jersey's (PANYNJ) Port Authority Trans Hudson (PATH) Service which has its Headquarter Offices in Jersey City, NJ. The remaining balance is being reallocated to the MTA. |
Subtotal (Multiple Transit Projects - NEW JERSEY) | $604,542,910 | $540,607,758 | $63,935,152 | ||
City of Long Beach | Long Beach NY - Sandy Relief | $518,364 | $518,364 | $0 | |
City of Long Beach | Long Beach NY - Sandy Relief 2 | $4,581,841 | $4,581,841 | $0 | |
Nassau InterCounty Express | Nassau County NICE Sandy Recovery | $45,214 | $45,214 | $0 | |
New York City Department of Transportation | New York City Department of Transportation | $12,029,487 | $12,029,487 | $0 | |
New York City Department of Transportation | New York City Department of Transportation | $33,918,813 | $33,918,813 | $0 | Total FTA Funds Allocated reflects amount allocated in the Federal Register /Vol. 78, No. 61 / Friday, March 29, 2013 /Notices. Through a series of grant actions all funds have been obligated. |
New York City Department of Transportation | NYCDOT - Round 2 Recovery | $2,834,128 | $2,834,128 | $0 | |
New York Metropolitan Transportation Authority | NYMTA - Round 2 Recovery | $1,702,462,214 | $1,702,462,214 | $0 | |
New York Metropolitan Transportation Authority | NYMTA - Sandy Relief | $193,893,898 | $193,893,898 | $0 | |
New York Metropolitan Transportation Authority | New York Metropolitan Transportation Authority | $1,000,415,662 | $1,000,415,662 | $0 | |
New York Metropolitan Transportation Authority | New York MTA - Hurricane Sandy Recovery #4 | $432,019,737 | $432,019,737 | $0 | Total FTA Funds Allocated are in Federal Register/Vol. 81, No.128/July 5, 2016, p. 43706, entitled Fourth Allocation of Public Transportation Emergency Relief Funds in Response to Hurricane Sandy. All funds have been obligated. |
New York Metropolitan Transportation Authority | New York MTA - Hurricane Sandy Recovery funds reallocated from resilience | $335,246,598 | $335,246,598 | $0 | Total FTA Funds Allocated were initially allocated to support resilience projects. On December 14, 2016, FTA approved a request from the NY MTA to reallocate a total of $335,246,598 of Hurricane Sandy resilience funding to support recovery and rebuilding costs per the authority granted in Federal Register notice dated July 5, 2016 (Fourth Allocation of Public Transportation Emergency Relief Funds in Response to Hurricane Sandy). All funds have been obligated. |
Westchester County Department of Transportation | Westchester Cty - Sandy Relief | $317,200 | $317,200 | $0 | |
Subtotal (Multiple Transit Projects - NEW YORK) | $3,718,283,156 | $3,718,283,156 | $0 | ||
Port Authority of New York and New Jersey | PANYNJ WTC - Sandy Relief | $54,243,826 | $54,243,826 | $0 | Total FTA Funds Allocated are to support activities related to the World Trade Center Transportation Hub (WTC) which has its headquaters in New York and is a part of the The Port Authority of New York and New Jersey (PANYNJ). |
Port Authority of New York and New Jersey | Port Authority of New York and New Jersey | $275,156,637 | $275,156,637 | $0 | |
Port Authority of New York and New Jersey | PANYNJ - Round 2 Recovery | $583,904,018 | $583,904,018 | $0 | |
Port Authority of New York and New Jersey | Port Authority NY/NJ - Hurricane Sandy Recovery #4 | $299,760,847 | $299,760,847 | $0 | Total FTA Funds Allocated are in Federal Register/Vol. 81, No.128/July 5, 2016, p. 43706, entitled Fourth Allocation of Public Transportation Emergency Relief Funds in Response to Hurricane Sandy. All funds have been obligated. |
Port Authority of New York and New Jersey | Hurricane Sandy Recovery funds reallocated from resilience | $30,500,000 | 15,419,907 | $15,080,093 | |
Subtotal (Multiple Transit Projects - NEW YORK/NEW JERSEY Metropolitan Area) | $1,243,565,328 | $1,228,485,235 | $15,080,093 | ||
Southeastern Pennsylvania Transportation Authority | SEPTA - Sandy Relief | $1,192,568 | $1,192,568 | $0 | |
Subtotal (Multiple Transit Projects - PENNSYLVANIA) | $1,192,568 | $1,192,568 | $0 | ||
Rhode Island Public Transit Authority | Rhode Island Public Transit Authority | $1,179 | $1,179 | $0 | |
Rhode Island Public Transit Authority | RIPTA Newport Gateway Center | $1,602,000 | $1,602,000 | $0 | Total Funds Allocated were listed in the Federal Register/Vol. 78, No.61/March 29, 2013, p. 19363 under Reserved for future allocation. All funds have been obligated. |
Rhode Island Public Transit Authority | RIPTA - Final Supplemental Sandy Allocation FY16 | $4,346,001 | $4,346,001 | $0 | Total Funds Allocated were listed in the Federal Register/Vol. 78, No.61/March 29, 2013, p. 19363 under Reserved for future allocation. All funds have been obligated. |
Subtotal (Multiple Transit Projects - RHODE ISLAND) | $5,949,180 | $5,949,180 | $0 | ||
Reserved for future allocation | $2,125,000 | $2,125,000 | Recovery funds from FAIN CT-44-X002 and NY-44-X004 in the total amount of $2,125,000 are reserved for future Hurricane Sandy projects. | ||
Total - Recovery Funds | $5,576,087,760 | $5,558,877,523 | $17,210,237 |
Competitive Resilience Projects
FTA Funding Allocations for Hurricane Sandy Competitive Resilience Projects
(As of November, 2023)
Name of Recipient |
Project Name |
Total FTA Funds Allocated |
FTA Obligated Allocation Amount |
Remaining Allocation |
Notes and Comments |
---|---|---|---|---|---|
Connecticut Department of Transportation | Connecticut DOT - Replacement of Norwalk River Railroad Bridge | $160,979,022 | $160,979,022 | $0 | |
Connecticut Department of Transportation | Connecticut DOT - New Haven Rail Yard Power Upgrade | $8,978,750 | $8,661,685 | $317,065 | |
Subtotal (Multiple Resilience Projects - CONNECTICUT) | $169,957,772 | $169,640,707 | $317,065 | ||
Washington Metropolitan Area Transit Authority | WMATA - Protecting the Subway System by Raising Ventilation Shaft Elevations | $13,500,000 | $13,500,000 | $0 | |
Washington Metropolitan Area Transit Authority | WMATA - Protecting WMATA's Existing Subway System Investment by Improving Drainage | $7,500,000 | $7,499,862 | $138 | |
Subtotal (Multiple Resilience Projects - DISTRICT OF COLUMBIA) | $21,000,000 | $20,999,862 | $138 | ||
Massachusetts Bay Transportation Authority | MBTA - Green Line Fenway Portal Floodproofing | $21,673,689 | $21,673,689 | $0 | |
Massachusetts Bay Transportation Authority | MBTA - Charlestown Seawall Replacement | $13,391,443 | $13,391,443 | $0 | |
Subtotal (Multiple Resilience Projects - MASSACHUSETTS) | $35,065,132 | $35,065,132 | $0 | ||
City of Nassua | City of Nashua, NH - Nashua Transit Facility Back-up Power Supply | $25,781 | $25,781 | $0 | |
Subtotal (Multiple Resilience Projects - NEW HAMPSHIRE) | $25,781 | $25,781 | $0 | ||
New Jersey Transit Corporation | New Jersey Transit - Delco Lead Safe Haven Storage and Re-Inspection Facility Project | $184,493,910 | $184,493,910 | $0 | |
New Jersey Transit Corporation | New Jersey Transit - Hoboken Long Slip Flood Protection | $146,548,432 | $146,548,432 | $0 | |
New Jersey Transit Corporation | New Jersey Transit - Raritan River Drawbridge Replacement Project | $446,312,465 | $446,312,465 | $0 | |
New Jersey Transit Corporation | New Jersey Transit - NJ TransitGrid | $409,764,814 | $409,764,814 | $0 | |
New Jersey Transit Corporation | New Jersey Transit - Train Controls, Wayside Signals, Power & Communication | $88,903,190 | $88,903,190 | $0 | |
Port Authority of New York and New Jersey | PANYNJ - PATH Exchange Place, Newport Station & Grove Street Station Head House Protection | $37,084,650 | $37,084,650 | $0 | |
Port Authority of New York and New Jersey | PANYNJ - PATH Harrison Car Maintenance Facility Automatic Flood Barrier | $14,861,400 | $14,861,400 | $0 | |
Port Authority of New York and New Jersey | PANYNJ - PATH Extension of Rail Yards | $18,900,000 | $18,900,000 | $0 | |
Port Authority of New York and New Jersey | PANYNJ - PATH Concrete Sea Wall East of Harrison Car Maintenance Facility | $16,815,975 | $16,815,975 | $0 | |
Subtotal (Multiple Resilience Projects - NEW JERSEY) | $1,363,684,836 | $1,363,684,836 | $0 | ||
New York City Department of Transportation | New York City DOT - Comprehensive Ferry Transit Resilience Project | $191,550,000 | $191,550,000 | $0 | |
New York Metropolitan Transportation Authority | New York MTA - Emergency Communications Enhancements (NYCT) | $74,950,000 | $59,950,000 | $0 | Total FTA Allocated Funds were allocated in Federal Register /Vol. 79, No. 214 /Wednesday, November 5, 2014 /Notices to support competitive reseliency (CR). FTA approved reallocating $15,000,000 from CR to repair and have been obligated. All remaining CR funds have been obligated. |
New York Metropolitan Transportation Authority | New York MTA - Flood Mitigation in Yards (NYCT) | $617,200,000 | $503,072,497 | $0 | Total FTA Allocated Funds were allocated in Federal Register /Vol. 79, No. 214 /Wednesday, November 5, 2014 /Notices to support competitive reseliency (CR). FTA approved reallocating $114,127,503 from CR to repair and have been obligated. All remaining CR funds have been obligated. |
New York Metropolitan Transportation Authority | New York MTA - Hardening of Substations in Flood Prone Areas and Purchase of Mobile Substations (NYCT) | $112,050,000 | $112,050,000 | $0 | |
New York Metropolitan Transportation Authority | New York MTA - Protection of Tunnel Portals and Internal Tunnel Sealing (NYCT) | $43,090,000 | $19,332,799 | $0 | Total FTA Allocated Funds were allocated in the Federal Register on November 5, 2014 to support competitive reseliency (CR). FTA approved reallocating $23,757,201 from CR to repair and have been obligated. All remaining CR funds have been obligated. |
New York Metropolitan Transportation Authority | New York MTA - Flood Resiliency for Long Island City Yard (LIRR) | $19,150,000 | $13,454,229 | $0 | Total FTA Allocated Funds were allocated in Federal Register /Vol. 79, No. 214 /Wednesday, November 5, 2014 /Notices to support competitive reseliency (CR). FTA approved reallocating $5,695,771 from CR to repair and have been obligated. All remaining CR funds have been obligated. |
New York Metropolitan Transportation Authority | New York MTA - Flood Resiliency for Critical Support Facilities (NYCT) | $24,320,000 | $24,320,000 | $0 | |
New York Metropolitan Transportation Authority | New York MTA - Protection of Street Level Openings in Flood Prone Areas (NYCT) | $300,690,000 | $194,268,073 | $0 | Total FTA Allocated Funds were allocated in Federal Register /Vol. 79, No. 214 /Wednesday, November 5, 2014 /Notices to support competitive reseliency (CR). FTA approved reallocating $106,421,927 from CR to repair and have been obligated. All remaining CR funds have been obligated. |
New York Metropolitan Transportation Authority | New York MTA - Metro-North Railroad Power and Signals Resiliency Improvements | $37,500,000 | $37,500,000 | $0 | |
New York Metropolitan Transportation Authority | New York MTA - Internal Station Hardening (NYCT) | $19,730,000 | $19,730,000 | $0 | |
New York Metropolitan Transportation Authority | New York MTA - Pumping Capacity Improvements (NYCT) | $24,140,000 | $10,315,815 | $0 | Total FTA Allocated Funds were allocated in Federal Register /Vol. 79, No. 214 /Wednesday, November 5, 2014 /Notices to support competitive reseliency (CR). FTA approved reallocating $13,824,185 from CR to repair and have been obligated. All remaining CR funds have been obligated. |
New York Metropolitan Transportation Authority | New York MTA - Right-of-Way (ROW) Equipment Hardening in Flood-Prone Areas (NYCT) | $63,550,000 | $17,467,563 | $0 | Total FTA Allocated Funds were allocated in Federal Register /Vol. 79, No. 214 /Wednesday, November 5, 2014 /Notices to support competitive reseliency (CR). FTA approved reallocating $46,082,437 from CR to repair and have been obligated. All remaining CR funds have been obligated. |
New York Metropolitan Transportation Authority | New York MTA - New York-New Jersey River to River Rail Resiliency (R4) Project (LIRR) | $81,007,104 | $67,527,126 | $0 | Total FTA Allocated Funds were allocated in Federal Register /Vol. 79, No. 214 /Wednesday, November 5, 2014 /Notices to support competitive reseliency (CR). A total of $13,479,978 was transferred to the FRA leaving a balance of $67,527,126 to support resiliency efforts. FTA has obligated the remaining balance of CR funds. |
New York Metropolitan Transportation Authority | New York MTA - Rockaway Line Protections (NYCT) | $136,820,000 | $136,820,000 | $0 | |
New York Metropolitan Transportation Authority | New York MTA - Flood Resiliency for Critical Bus Depots (NYCT) | $44,770,000 | $44,770,000 | $0 | |
Port Authority of New York and New Jersey | PANYNJ - Penn-Moynihan Station Complex Train-shed Hardening Project | $40,200,000 | $0 | $0 | Total FTA Allocation was listed in Federal Register /Vol. 79, No. 214 /Wednesday, November 5, 2014 /Notices, to support the the PANY/NJ Penn-Moynihan Station Complex Train-shed Hardening Project. FTA approved reallocating the $40,200,000 to the Federal Railroad Administration. |
Port Authority of New York and New Jersey | PANYNJ - World Trade Center Site and Transit Facilities Flood Mitigation and Resiliency Improvements Program | $84,675,000 | $84,675,000 | $0 | |
Subtotal (Multiple Resilience Projects - NEW YORK) | $1,915,392,104 | $1,536,803,102 | $0 | ||
Southeastern Pennsylvania Transportation Authority | SEPTA - Ancillary Control Center Project | $9,003,000 | $9,003,000 | $0 | |
Southeastern Pennsylvania Transportation Authority | SEPTA - Railroad Embankment & Slope Stabilization Project | $18,739,000 | $18,739,000 | $0 | |
Southeastern Pennsylvania Transportation Authority | SEPTA - Sharon Hill Line Flood Mitigation Project | $3,752,000 | $3,752,000 | $0 | |
Southeastern Pennsylvania Transportation Authority | SEPTA - Railroad Signal Power Reinforcement Project | $32,026,000 | $32,026,000 | $0 | |
Southeastern Pennsylvania Transportation Authority | SEPTA - Jenkintown Area Flood Mitigation Project | $14,987,000 | $14,987,000 | $0 | |
Southeastern Pennsylvania Transportation Authority | SEPTA - Manayunk/Norristown Line Shoreline Stabilization Project | $4,502,000 | $4,502,000 | $0 | |
Southeastern Pennsylvania Transportation Authority | SEPTA - Subway Pump Room Emergency Power Project | $3,749,000 | $3,749,000 | $0 | |
Subtotal (Multiple Resilience Projects - PENNSYLVANIA) | $86,758,000 | $86,758,000 | $0 | ||
Subtotal - Competitive Resilience Funds | $3,591,883,625 | $3,212,977,420 | $317,203 |
Local Priority Resilience Projects
FTA Funding Allocations for Hurricane Sandy Local Priority Resilience Projects
(As of November, 2023)
Name of Recipient |
Project Name |
Total FTA Funds Allocated |
FTA Obligated Allocation Amount |
Remaining Allocation |
Notes and Comments |
---|---|---|---|---|---|
New York City Department of Transportation | NYCDOT - Local Pr. Resiliency | $8,561,124 | $8,561,124 | $0 | |
New York Metropolitan Transportation Authority | NYMTA - Local Pr. Resiliency | $897,848,194 | $887,513,619 | $0 | Total FTA Funds Allocated were allocated in the Federal Register /Vol. 78, No. 107 / Tuesday, June 4, 2013 /Notices. FTA approved the transfer of $10,334,575 to support repair efforts. All funds have been obligated. |
Subtotal (Multiple Transit Projects - NEW YORK) | $906,409,318 | $896,074,743 | $0 | ||
New Jersey Transit Corporation | NJ Transit - Local Pr. Resiliency | $106,199,045 | $106,199,045 | $0 | |
Port Authority of New York and New Jersey | PANYNJ - Local Pr. Resiliency | $287,391,637 | $253,225,884 | $3,665,753 | Total FTA Funds Allocated ($287,391,637) were allocated in the Federal Register /Vol. 78, No. 107 / Tuesday, June 4, 2013 /Notices to support local priority Resilency (LPR). FTA approved reallocating $30,500,000 of local priority resilency to support recovery expenses leaving a balance of $256,891,637 of LPR funds. Through a series of actions FTA obligated a total $253,225,884 leaving an unobligated balance of $3,665,753. |
Subtotal (Multiple Transit Projects - NEW JERSEY) | $393,590,682 | $359,424,929 | $3,665,753 | ||
Subtotal Local Priority Resilience Funds | $1,300,000,000 | $1,255,499,672 | $3,665,753 |
Learn more about Hurricane Sandy Disaster Relief.
Last updated: Tuesday, November 7, 2023