Procurement

936

Risk Category

Lesson Phase(s) MassDot Risks, Concerns and Lessons Learned

Project Development, Engineering, Procurement and Construction

West Line Purple Line Extension Project

Engineering, Procurement, Construction...

FTA Project and Construction Management Guidelines

FTA developed these guidelines to help those involved in advancing transit capital projects achieve success in implementing projects, specifically  project scope, function, schedule, cost, safety, and quality.

FTA Construction Management Handbook 2016

The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies, also referred to as Project Sponsors) undertaking substantial construction projects, either for the first time or with little prior experience with construction project management.

Four-Quadrant Gated Crossing

Title: Four-Quadrant Gated Crossing

Phase(s): Construction

Category: Scope

Date: September 13, 2000

1. Background

On September 29, 1997, the Massachusetts Bay Transportation Authority (MBTA) successfully completed the rehabilitation of the Old Colony Railroad...

Westside Purple Line Risk Assessment Lessons Learned

Over 200 "Lessons Learned" were collected from the following sources:

Metro Project Delivery Team Metro Engineering PB Team (Design/Design Services) Construction Management Support Services Consultant

Collected from the following work:

Design/Build (Tunnels,...

Project Management Plan (PMP) Development

Title: Project Management Plan (PMP) Development

Phase(s): Pre-Preliminary Engineering and Preliminary Engineering 

Category: Management

Date: March 2, 1998

1. Background

The Fort Worth Transportation Authority (the "T") is embarked on a major...

BPPM Mandatory Procurement Standards Worksheet

No.ElementFTA Circular 4220.1EParagraph No.Grantee Procurement Policy/Procedure Reference1)Written Standards of Conduct7.c. 2)Contract Administration System7.b. 3)Written Protest Procedures7.l. 4)Prequalification System8.d. 5)System for Ensuring Most Efficient and Economic...

BPPM Hiawatha Line Public Art and Design Budget

#Description of CommissionDesign Phase AllocationEstimated Additional Allocation for Construction DrawingsFabrication and Installation Phase Max AllocationMaximum Total Commission

1

System-Wide Interactive Artwork

$45,000

$5,000

Not Applicable

$50,000

2

...

BPPM Example of Statement of Qualification of Subcontractor

The statements herein are confidential and made solely for the information of the New York City Transit Authority in connection with the proposed subcontract with _________________________________________________________________________ Name of General Contractor ...