Buy America Final Assembly Letters

Date

Final Assembly Letter

Summary

06/08/2017 FR Conversions

FTA determined that the processes by which FR Conversions undertakes to convert minivans into wheelchair-accessible vehicles are sufficient to meet the Buy America requirements for final assembly.

11/25/2014 Mobility Works Commercial FTA determined that the processes by which Mobility Works Commercial converts incomplete Chrysler and Dodge minivans into its wheelchair accessible minivans satisfies FTA’s Buy America requirements for final assembly.
09/05/2014 Lone Star Handicap Vans, LLC - 09/05/2014 FTA determined that the processes by which Lone Star Handicap Vans, LLC, converts incomplete Chrysler and Dodge minivans into its wheelchair accessible minivans satisfies FTA’s Buy America requirements for final assembly.
06/25/2014 AutoAbility, LLC FTA determined that the processes by which AutoAbility, LLC, converts incomplete Chrysler and Dodge minivans into its wheelchair accessible minivans satisfies FTA’s Buy America requirements for final assembly.
07/01/2013 Braun Corporation

FTA determined that the processes by which the Braun Corporation converts incomplete Chrysler minivans into Braun Entervans satisfies FTA’s Buy America requirements for final assembly. 

07/01/2013 El Dorado National Kansas FTA determined that the processes by which ElDorado converts incomplete Chrysler and Dodge minivans into ElDorado Amerivans satisfies FTA’s Buy America requirements for final assembly. 
05/22/2012 Los Angeles County Metropolitan Transportation Authority FTA determined that Kinkisharyo International Inc.’s plan to produce and deliver at least 78 light rail vehicles to the Los Angeles County Metropolitan Transportation Authority complied with FTA’s final assembly requirements.
04/02/2012 Miami-Dade Transit FTA determined that the final assembly approach outlined by AnsaldoBreda S.P.A. for Miami-Dade Transit Heavy Rail Vehicles met the final assembly requirements contained in Appendix D to 49 C.F.R. 661.11.
07/23/2010 Washington Metropolitan Area Transit Authority FTA determines that the final assembly approach outlined by Kawasaki Rail Car, Inc. for the Washington Metropolitan Area Transit Athority 7000 Series Railcars complies with the minimum requirements for final assembly countained at Appendix D to 9 CFR 661.11.