General

Legacy ID
36

Timely Preparation of Quality Assurance Program

Title: Timely Preparation of Quality Assurance Program

Phase(s): Pre-Preliminary Engineering and Preliminary Engineering

Category: Management

Date: April 4, 1997

1. Background

The "Lessons Learned" statement presented is derived from PMOC experience...

The Capabilities and Value of Electronic Communications

Title: The Capabilities and Value of Electronic Communications Phase(s): Pre-Preliminary Engineering, Preliminary Engineering, Final Design, Construction and Startup Category: Management September 8, 1997 1. Background During design and construction of Phase One of the St. Louis Light Rail...

Team Approach to Quality Assurance Audits

Title: Team Approach to Quality Assurance Audits

Phase(s): Final Design

Category: Management

Date: April 4, 1997

1. Background

The 7.5 Tasman West light Rail Project in San Jose, California has strong local support. The light rail system extension...

Staged Infrastructure Implementation Impacts on Operations

Title: Staged Infrastructure Implementation Impacts on Operations

Phase(s): Final Design and Construction

Category: Management

Date: March 4, 1997

1. Background

In 1988, the Florida Department of Transportation (FDOT) purchased 81 miles of the CSX...

Safety Certification for Commuter Rail Projects

Date: July 10, 2015

Project Name: Central Florida Commuter Rail Transit (CFCRT) Project – Phase 1

Abstract: Safety Certification on Phase 1 of the CFCRT Project encountered a number of issues when certifying design, construction, testing, and pre-revenue operations....

Railroad Right-of-Way Issues

Title: Railroad Right-of-Way Issues

Phase(s): Preliminary Engineering

Category: Management

Date: June 23, 1997

1. Background

The Port Authority of Allegheny County's (PAT) Phase I Airport Busway/Wabash HOV Facility consists of a 7.0 mile exclusive...

Railroad Right-of-Way Acquisition

Title: Railroad Right-of-Way Acquisition

Phase(s): Pre-Preliminary Engineering

Category: Management

Date: March 2, 1998

1. Background

The Utah Transit Authority (UTA) is constructing a Light Rail Transit (TRAX) project running from a southern terminus...

QA/QC Procedures and Organization

Title: QA/QC Procedures and Organization

Phase(s): Pre-Preliminary Engineering and Preliminary Engineering

Category: Management

Date: September 16, 2008

1. Background

The Charlotte Area Transit System (CATS) South Corridor Light Rail Project (SCLRP...

Public Outreach Program Related to Right-of-Way Acquisition

Title: Public Outreach Program Related to Right-of-Way Acquisition

Phase(s): Construction

Category: Management

Date: April 4, 1997

1. Background

Light rail transit projects generally cross several political jurisdictions and involve the participation of...

Project Master Integrated Schedule (PMIS)

Title: Project Master Integrated Schedule (PMIS) – Schedule Management Plan

Phase(s): Final Design and Construction

Category: Management

Date: April 22, 2009

1. Background

Project requirements include plan development for each aspect of the project such...