Transcript for The ADA and Paratransit Webinar (PDF)
FTA ADA Circular Webinar 2 Transcript: The ADA and Paratransit Service Requirements
FTA ADA Circular Webinar 2 Transcript: The ADA and Paratransit Service Requirements
FTA ADA Circular Webinar 3 Transcript: The ADA and Fixed Route Service Requirements
This transcript from FTA's spring 2016 webinar series details fixed-route requirements, e.g. priority seating in the securement area, alternative transportation when bus lifts malfunction, bus stop obstructions, passenger boarding, etc. under the Americans with Disabilities...
FTA ADA Circular Webinar 1 Transcript: ADA General Requirements, Oversight and Monitoring
ADA Fixed Route Service Requirements
This report summary presents the results of the independent evaluation of the Vehicle Assist and Automation (VAA) Demonstration. The project demonstrated and evaluated a proof-of-concept VAA system in revenue service operations, which included lateral control and precision docking capabilities...
This report presents the results of the VAA project, designed to test lateral guidance/control on a stretch of a high occupancy vehicle (HOV) lane and through a toll booth on AC Transit’s M Line, which connects Castro Valley, Hayward, and Union City with San Mateo and Santa Clara counties,...
The report summary provides a description of the Asset Management Guide, which presents a framework for transit asset management tailored to small providers and a master template for developing a Transit Asset Management (TAM) Plan to improve the management of transit assets while meeting...
Quick-reference guide for setting up a PIN in TrAMS.
An excel sheet containing a list of FTA's Compendium of Transit Safety Standards.