Title: Documentation for Design Changes - Metropolitan Atlanta Rapid Transit Authority (MARTA)
Phase(s): Construction
Category: Scope
Date: ...
Title: Documentation for Design Changes - Metropolitan Atlanta Rapid Transit Authority (MARTA)
Phase(s): Construction
Category: Scope
Date: ...
Title: Environmental Remediation and Clean-up
Phase(s): Preliminary Engineering
Category: Scope
Date: April 4, 1997
...
Title: Four-Quadrant Gated Crossing
Phase(s): Construction
Category: Scope
Date: September 13, 2000
On September...
Title: Four-Quadrant Gated Crossing
Phase(s): Construction
Category: Scope
Date: September 13, 2000
On September 29,...
Title: Grade Crossing Safety Improvement Program
Phase: Start-Up
Category: Scope
Date: N/A
The Los Angeles...
Title: Modular Station Design
Phase(s): Pre-Preliminary Engineering, Preliminary Engineering and Final Design
Category: Scope
Date: N/A
Title: Quality Assurance and Quality Control on a Design/Build Transit Project
Phase(s): Preliminary Engineering
Category: Scope
Date: September...
Title: R&D Projects – Computer Based Systems Warranties
Phase(s): Start-Up
Category: Scope
Date: August 2000
The...
Title: Waterproofing and Its Effect on Operation and Maintenance of Underground Facilities
Phase(s): Preliminary Engineering
Category: Scope
Date:...
Number 2010-10
03-03-15
The Office of Operations and Program Management for the Region 10 Office in Seattle, Washington has an opening for a permanent full-time General Engineer GS-0801-13.
This position serves as a...