What are the TIP/STIP requirements for ER grants?
Emergency and permanent repairs do not need to be in the TIP/STIP if the repairs do not include changes to the location, capacity, or function of the transit asset. However, FTA recommends that such repair projects undertaken more than a year after a disaster be programmed in the TIP/STIP to ensure that projects are planned and funded alongside non-emergency transportation projects within the State and/or metropolitan planning region. All other ER projects must be in the TIP/STIP prior to incurring costs.