Public Transit
Wayside Worker Protection Technology— TrackSafe Phase II Research & Demonstration Report Summary
This document summarizes the report that outlines research and demonstration of a roadway worker protection (RWP) warning technology developed by Bombardier Rail called TrackSafe. The system was installed at the Metropolitan Atlanta Rapid Transit Authority (MARTA) and was designed to...
Wayside Worker Protection Technology—TrackSafe Phase II Research & Demonstration (Report 0194)
This report outlines research and demonstration of a roadway worker protection (RWP) warning technology developed by Bombardier Rail called TrackSafe. The system was installed at the Metropolitan Atlanta Rapid Transit Authority (MARTA) and was designed to reduce the hazards of working within a...
Responsibilities of Recipients and Manufacturers
The contents of this page do not have the force and effect of law and are not meant to bind the public in any way. This page is intended only to provide clarity to the public regarding existing requirements under the law or agency policies. Recipients and subrecipients should refer to FTA’s...Calculating, Documenting, and Charging Operating Expenses Webinar Transcript
Transcript from the Calculating, Documenting, and Charging Operating Expenses Webinar on May 6, 2021.
Public Transportation Agency Safety Plan Reminder Letters May 2021
On May 10, 2021, FTA issued letters to State Department of Transportation Secretaries and transit agency CEOs to remind them of the requirements of the Public Transportation Agency Safety Plan (PTASP) regulation (49 CFR Part 673). The PTASP regulation requires recipients and subrecipients...
PTASP Technical Assistance Center and Resource Library
PTASP-Technical Assistance Center
PTASP Community of Practice
PTASP Community of Practice