Do projects funded under the ER program need to be included in the TIP/STIP?
Emergency Relief Operating and Capital Projects that have been validated by FTA for Categories 1-3 do not need to be placed in the TIP/STIP. See February 6, 2012 FRN.Other Emergency Relief projects, including those funded through a pro-rated or future allocation, are subject to the joint FHWA-FTA planning rule (23 CFR 450.324). The joint planning rule requires that capital and non-capital surface transportation projects (or phases of projects) within the boundaries of the metropolitan planning area proposed for funding under 23 U.S.C. and 49 U.S.C. Chapter 53 be included in the TIP (and STIP) prior to incurring costs, unless the project qualifies as one of the exceptions listed in the rule. 23 CFR 450.324 provides that emergency relief projects are not required to be included in the TIP (and STIP) except for those involving substantial functional, locational, or capacity changes.To qualify for this exception, the grantee must certify in writing that the emergency relief project does not involve substantial functional, locational or capacity changes and that the local share is available. The Grantee must submit this documentation to FTA in order for the project to be eligible for federal participation. Absent such certification, FTA expects Emergency Relief projects to be included in the TIP/STIP prior to incurring costs. Grantees may petition FTA for a waiver from this requirement by using the FTA docket process outlined in this Q&A document. FTA encourages grantees to work closely with their MPO in determining whether to include emergency relief projects in the TIP, and ultimately in the STIP.Guidance for addressing Resiliency Projects will be forthcoming.